![]() |
I'm instructing at that one.
|
Quote:
|
Quote:
|
Made some CAD revisions to the remaining parts today and should have them started in the CNC tomorrow afternoon! This is still coming along... not 100% as quickly as I hoped once it hit production, but we are making it very nice. Hoping to email out final photos before anodizing next week. I cannot wait, I just hit nasty starvation again yesterday on the street... I cant even begin to imagine the frustrations you guys on the track must encounter... no wonder everyone was getting salty that this was taking so long for us to get into production!!
|
anxiously waiting to send you some $$$$
|
Quote:
|
^^ anxiously waiting to collect, lol
|
Quote:
|
still interested
|
Anything yet?
|
CNC is running... this thing is turning out AWESOME. I think we will have pricing details for the end of this week, we are far enough along now to be able to calculate machine time for the components and material costs.
|
^awesome
|
That is great news!
Sent from my myTouch_4G_Slide using Tapatalk 2 |
Only one component left to machine now. Then the batch is off to get anodized.
|
any chance I can have one by the end of the month?
|
Quote:
|
Well I am off to the Track again. I get to have fun with my fuel starving. There is a Real long right hand turn this weekend in the 2.75 mile NOLA track. Boy it's going to SUCK..
|
Quote:
After the machining is all done, we get the parts anodized. The anodizer usually has the parts for 3-5 days. Anodizing is not required.. but we do it as a way of stamping the parts as "complete" and ready for use... and because it is just more professional looking to us. I would personally recommend waiting out the anodizing. Its also nice because it removes conductivity from anodized surfaces, which can be nice for parts with wiring inside the gas tank. We will see how the last part comes together and how quickly and go from there. Everything else for this has been taking longer than expected and I trust that the theme may continue. |
Definitely interested in getting the product. Too bad I won't be able to have it before my track day on July 8th.
|
I might be back in on this. Won't know for two weeks.
|
Just did a little bench testing with it mostly assembled. Everything is working great. This is a really kick *** device.
|
Quote:
|
Just after my last post I started the long write up on all the details, but halfway through I got pulled into a meeting that took until long after hours. I'll try and see if I can finish it up tomorrow.
|
Quote:
|
I'm convinced this whole thing is a sick joke! a 2-year tease lol
|
So production/testing for the forced induction model starts when this batch is complete?
Sent via Tapatalk 2 on my D-Team G-Slate |
Quote:
|
Quote:
|
Quote:
Still would rather have a fuel cell I think. |
Quote:
Sent via Tapatalk 2 on my D-Team G-Slate |
still interested
|
CNC has been running the last part since yesterday. Once this program is done we run another program on the last part and we can start sorting out installation/assembly. Final stretch now. There is no way I won't have these at the anodizer next week. Should hopefully have pricing details today.
|
Looking forward to it. :tup:
|
I should know something for you next week. Looking good.
|
Kepp up the good work!
|
Phunk. Can you PM me a contact number. Like to talk.
|
Phunk , you said there was 3 unit unspoken in the first production left.
If there is still one available , im very interested to get one asap !!! ;) |
^^ someone signed up yesterday. So unless someone backs out at payment time, there are 2 left in this batch... and there is plenty of room for that since we still havent even given the price.
Speaking of price, I have all the materials and everything in the spreadsheet, today we hope to get around to entering machine time in there so all that gets calculated and then I should have some useful numbers. |
I'll take one for sure. Pm sent. I'll call you later.
|
Pending price
|
All times are GMT -5. The time now is 01:15 AM. |
Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Search Engine Optimization by vBSEO 3.6.0 PL2