Nissan 370Z Forum  

How much to do a job?

Originally Posted by 2string1 Cutting what? Takes about 10mins a side to dremel out the hole to be a little wider so you can use aftermarket toe bolt for greater

Go Back   Nissan 370Z Forum > Nissan 370Z General Area > Nissan 370Z General Discussions


Like Tree11Likes

Reply
 
LinkBack Thread Tools Display Modes
Old 03-30-2022, 07:34 PM   #1 (permalink)
Base Member
 
Join Date: May 2021
Location: washington
Posts: 58
Drives: 14 Q60 awd SPORT
Rep Power: 3359
14Q60awdSPORT has a reputation beyond repute14Q60awdSPORT has a reputation beyond repute14Q60awdSPORT has a reputation beyond repute14Q60awdSPORT has a reputation beyond repute14Q60awdSPORT has a reputation beyond repute14Q60awdSPORT has a reputation beyond repute14Q60awdSPORT has a reputation beyond repute14Q60awdSPORT has a reputation beyond repute14Q60awdSPORT has a reputation beyond repute14Q60awdSPORT has a reputation beyond repute14Q60awdSPORT has a reputation beyond repute
Default

Quote:
Originally Posted by 2string1 View Post
Cutting what?
Takes about 10mins a side to dremel out the hole to be a little wider so you can use aftermarket toe bolt for greater range of toe adjustment.
babyzilla likes this.
14Q60awdSPORT is offline   Reply With Quote
Old 03-30-2022, 10:17 PM   #2 (permalink)
Enthusiast Member
 
k67p67's Avatar
 
Join Date: Oct 2016
Location: Rancho Cucamonga, CA
Posts: 312
Drives: 2017 Nismo Tech 6MT
Rep Power: 3937
k67p67 has a reputation beyond reputek67p67 has a reputation beyond reputek67p67 has a reputation beyond reputek67p67 has a reputation beyond reputek67p67 has a reputation beyond reputek67p67 has a reputation beyond reputek67p67 has a reputation beyond reputek67p67 has a reputation beyond reputek67p67 has a reputation beyond reputek67p67 has a reputation beyond reputek67p67 has a reputation beyond repute
Default

The OP's shop definitely overcharged for labor. Struts/shocks/springs should take no more than 2 hours. Let's be generous and estimate one hour for the rear camber arms. One more hour for the rotors and pads (no extra charge for the rotors since the calipers had to be removed to change pads). Lastly, an hour for the alignment. That totals 5 labor hours. I can easily do all but the alignment on my garage floor with jack stands in the 4 hours I estimated.
__________________
SOLD2017 370Z Nismo Tech 6MT PART OUT IN PROGRESS
Work | Motordyne | Powertrix | Swift | Michelin | Takeda | Hotchkis | RJM | Voodoo13 | SPL | SPC | Z1 Motorsports | ZSpeed | Morimoto | Craft Square
k67p67 is offline   Reply With Quote
Reply

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On
Trackbacks are On
Pingbacks are On
Refbacks are On



All times are GMT -5. The time now is 06:51 AM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Search Engine Optimization by vBSEO 3.6.0 PL2