Nissan 370Z Forum

Nissan 370Z Forum (http://www.the370z.com/)
-   Intake/Exhaust (http://www.the370z.com/intake-exhaust/)
-   -   Fast Intentions Long Tube Headers are here! (http://www.the370z.com/intake-exhaust/12436-fast-intentions-long-tube-headers-here.html)

F.I. Inc. 02-24-2010 08:59 PM

Quote:

Originally Posted by docaam (Post 415582)
ok if these will fit G37coupe will these fit the 2007+ G35 sedan as well?

I have not test fit them on the Sedan yet. I am confident that they will fit though.

docaam 02-25-2010 03:05 AM

Quote:

Originally Posted by F.I. Inc. (Post 416297)
I have not test fit them on the Sedan yet. I am confident that they will fit though.

can do a test fit on it as well once recieved...so another benchmark for you:icon17:

F.I. Inc. 02-25-2010 09:16 AM

Quote:

Originally Posted by docaam (Post 416608)
can do a test fit on it as well once recieved...so another benchmark for you:icon17:

I am assuming that you want a set for your Sedan as well! Let's get you set up with the cat back as well.

mattkim85 02-25-2010 03:19 PM

by the sound of the vids, they dont sound raspy...hmm..

maybe i'm so used to it being raspy with my hfcs.

can someone quote me on this?

docaam 02-26-2010 12:21 AM

Quote:

Originally Posted by F.I. Inc. (Post 416800)
I am assuming that you want a set for your Sedan as well! Let's get you set up with the cat back as well.

what i was thinking if it gets too loud on Z i might test fit on the sedan...wont add cat back but a Y pipe will do :icon17: will keep you posted

F.I. Inc. 02-26-2010 12:42 PM

UPDATE-

I just received conformation that the tooling has shipped from Italy and will be state side sometime towards the end of next week. The distribution center will inspect the tooling to make sure that it is correct and then send it out to me (Hopefully) next Thursday or Friday. If that is the case, I should have the tooling within 2 weeks from today.

From there we need about 2-4 days to play with it and get all of the bends and rotations down. Once we have everything indexed, we will begin production.

The first set of fixtures/jigs will be completed by the end of today and I hope to have the second set of fixtures/jigs completed by the middle of next week. The reason we have decided to build 2 sets is to (Hopefully) speed production up! Obviously I have not built a production set yet. So, I can only try and calculate how long it will take to build each set. I am (hoping) that 2 people can produce 3-4 sets a day. We will not be working on them every single day due to the fact that we only have 4 people including (me) and we are almost two months behind just on cat back builds. I would like to have 5-8 sets mailed out every week if possible.

We at Fast Intentions, Inc. appreciate everyones continued patience...

Thank you, Tony

vipor 02-26-2010 12:44 PM

:excited:

Sweet, that means once I get some extra money I won't be too far out getting my set :tup:

G37Sam 02-26-2010 04:13 PM

Thanks for the update Tony!

theDreamer 02-26-2010 04:15 PM

:excited:

dainedazz 02-26-2010 05:14 PM

Quote:

Originally Posted by F.I. Inc. (Post 418638)
UPDATE-

I just received conformation that the tooling has shipped from Italy and will be state side sometime towards the end of next week. The distribution center will inspect the tooling to make sure that it is correct and then send it out to me (Hopefully) next Thursday or Friday. If that is the case, I should have the tooling within 2 weeks from today.

From there we need about 2-4 days to play with it and get all of the bends and rotations down. Once we have everything indexed, we will begin production.

The first set of fixtures/jigs will be completed by the end of today and I hope to have the second set of fixtures/jigs completed by the middle of next week. The reason we have decided to build 2 sets is to (Hopefully) speed production up! Obviously I have not built a production set yet. So, I can only try and calculate how long it will take to build each set. I am (hoping) that 2 people can produce 3-4 sets a day. We will not be working on them every single day due to the fact that we only have 4 people including (me) and we are almost two months behind just on cat back builds. I would like to have 5-8 sets mailed out every week if possible.

We at Fast Intentions, Inc. appreciate everyones continued patience...

Thank you, Tony

:tup:

nixxer 02-26-2010 05:49 PM

Patiently waiting. Tony, would you pm me an estimate on my shipping costs? Thanks:tiphat:

docaam 02-27-2010 03:37 AM

thanks for the update....i guess we should be looking beginning of April for our dubai ones...np:tiphat:

1slow370 02-27-2010 03:58 AM

You need more welders/fabricators

E.Johnson 02-27-2010 06:05 AM

Quote:

Originally Posted by F.I. Inc. (Post 418638)
UPDATE-

I just received conformation that the tooling has shipped from Italy and will be state side sometime towards the end of next week. The distribution center will inspect the tooling to make sure that it is correct and then send it out to me (Hopefully) next Thursday or Friday. If that is the case, I should have the tooling within 2 weeks from today.

From there we need about 2-4 days to play with it and get all of the bends and rotations down. Once we have everything indexed, we will begin production.

The first set of fixtures/jigs will be completed by the end of today and I hope to have the second set of fixtures/jigs completed by the middle of next week. The reason we have decided to build 2 sets is to (Hopefully) speed production up! Obviously I have not built a production set yet. So, I can only try and calculate how long it will take to build each set. I am (hoping) that 2 people can produce 3-4 sets a day. We will not be working on them every single day due to the fact that we only have 4 people including (me) and we are almost two months behind just on cat back builds. I would like to have 5-8 sets mailed out every week if possible.

We at Fast Intentions, Inc. appreciate everyones continued patience...

Thank you, Tony



There is a saying here in sweden:

If you are waiting for something good/nice, you will never wait too long.. :tiphat:

The wait is no problem for me anyway, as long as I get them before my trip to Nürburgring =) :driving:

theDreamer 02-27-2010 10:27 AM

Quote:

Originally Posted by E.Johnson (Post 420027)
There is a saying here in sweden:

If you are waiting for something good/nice, you will never wait too long.. :tiphat:

The wait is no problem for me anyway, as long as I get them before my trip to Nürburgring =) :driving:

:eek:
You better have a few cameras mounted to your car for us to enjoy.


All times are GMT -5. The time now is 08:12 PM.

Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Search Engine Optimization by vBSEO 3.6.0 PL2