![]() |
Going to add J pipe to get rid of drone. Problem with math.
I'm going to add J pipes to get rid of drone at 2000rpm and 85cm should be enough, but I have no idea about this 85cm should be on both side or each side should be 32.5???
:facepalm:someone help me please, love you guys. |
All times are GMT -5. The time now is 07:22 AM. |
Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Search Engine Optimization by vBSEO 3.6.0 PL2