![]() |
Quote:
|
First OP finished, no to start the profiling of the gears. Pumps are being finished as well. So only thing to do after the profiles are cut is, QC gear profile, coat the gears, and install into pumps and do final QC.
As of right now, here is the list of everyone on the GB. 1. JARblue (Deposit Paid) XL 2. Rusty (Deposit Paid) XL 3. Spooler (Deposit Paid) XL 4. V8Killer (Deposit Paid) XL 5. Chuck33079 (Deposit Paid) 6. HotRodz (Deposit Paid)XL 7. CV129 (Deposit Paid)M 8. JB(FB) XL 9. EM (FB) (Deposit Paid) M 10. AH (FB) (Deposit Paid) XL 11. NB (FB) (Deposit Paid) XL 12. VH (FB) (Deposit Paid) 13. Beauz (Depost Paid) L 14. etownsoccer17 (Deposit Paid) M 15. Leadfooted (Deposit Paid) XL 16. Nick W. (Deposit Paid) L 17. 18. 19. 20. I have room for 4 more, before we are completely sold out on this run, if yall know anyone. Thanks again for all yalls support and look forward to seeing yalls builds! Thanks, Jeremiah |
Ah, I’ve already replaced my oil pump once before due to a crack near the bolt holes for the pickup tube when adding the Z1 oil pan spacer. Needless to say, I said screw it to the spacer. No, I did not over-torque it. Anyway, is the body of this one any stronger or is it still that pot metal like the OEM? Also, I skipped right to the end of this thread. What’s the deposit needed and total price?
|
Quote:
Total price is $1150 shipped, comes with a Tshirt in whatever size you need. You can pay in full as most have, or pay $750 now and remaining when ready to ship. I just need your name/address/email, and I can send you an invoice for the GB oil pump. Thanks, Jeremiah |
PM sent, I am still in on this deal. XL shirt for me too....
|
Quote:
|
Quote:
|
What pisses me off is I have traction from 3rd and up on the street. I had nothing and I mean nothing until 5th at the event I went too.
|
Quote:
I hear you bro, was good to see what you did on your current setup. |
Quote:
|
Quote:
|
Size L for me mate!
|
Quote:
|
2 Attachment(s)
Give you an idea of what the shirts look like.
Meant to take a pic of OP1 being finished and totally forgot, I apologize on that. Also, OP2 started yesterday, so looking for that process to be done by beginning to middle of next week. All pumps are in hand and going through our process before the gears go in. So, once the gears are finished and coated, we can put them in the pumps, QC, and then get the pumps out to you guys. Thanks for yalls patience and support. Let me know what yall think about the shirts as well. Thanks, Jeremiah |
How many extra pumps did you make?
|
All times are GMT -5. The time now is 01:19 AM. |
Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Search Engine Optimization by vBSEO 3.6.0 PL2