Nissan 370Z Forum

Nissan 370Z Forum (http://www.the370z.com/)
-   Forced Induction (http://www.the370z.com/forced-induction/)
-   -   Boosted Performance round 2 list (http://www.the370z.com/forced-induction/69496-boosted-performance-round-2-list.html)

Dzel 04-09-2013 07:43 PM

Quote:

Originally Posted by Baer383 (Post 2259208)
I tried to download the instructions but it kept failing.:shakes head:

I couldn't download it on my work laptop, but I could on my Samsung Note II.

m3chhawk 04-09-2013 07:50 PM

Quote:

Originally Posted by Baer383 (Post 2259208)
I tried to download the instructions but it kept failing.:shakes head:

I have it and converted it to PDF (19MB as opposed to 80+), PM me your email and I'll send it to ya.

Also Sasha, my anti-virus at work flagged that file hosting software for Trojan Horses. Just a heads up.

Baer383 04-09-2013 07:52 PM

Quote:

Originally Posted by m3chhawk (Post 2259333)
I have it and converted it to PDF (19MB as opposed to 80+), PM me your email and I'll send it to ya.

Also Sasha, my anti-virus at work flagged that file hosting software for Trojan Horses. Just a heads up.

PM inbound!!!!

Boosted Performance 04-09-2013 07:54 PM

Quote:

Originally Posted by m3chhawk (Post 2259333)
I have it and converted it to PDF (19MB as opposed to 80+), PM me your email and I'll send it to ya.

Also Sasha, my anti-virus at work flagged that file hosting software for Trojan Horses. Just a heads up.

Oh, that is not good, thanks for the heads up. I will convert it to .pdf tomorrow at work, and then email it to anybody looking for the instuctions.

Sorry about that, I know my upload/file is clean. So it must be from the host site.

m3chhawk 04-09-2013 07:59 PM

Quote:

Originally Posted by Boosted Performance (Post 2259342)
Oh, that is not good, thanks for the heads up. I will convert it to .pdf tomorrow at work, and then email it to anybody looking for the instuctions.

Sorry about that, I know my upload/file is clean. So it must be from the host site.

Yeah the upload is fine. Its the downloader for that site.

PDF'd and compressed it is still 18-19 MB so if you can't get it to mail, we use a free service at work all the time (mailbigfile.com). Works really well for stuff like this.

Baer, Gmail let me send the file, let me know if Yahoo bounces it.

Baer383 04-09-2013 08:03 PM

Quote:

Originally Posted by m3chhawk (Post 2259358)
Yeah the upload is fine. Its the downloader for that site.

PDF'd and compressed it is still 18-19 MB so if you can't get it to mail, we use a free service at work all the time (mailbigfile.com). Works really well for stuff like this.

Baer, Gmail let me send the file, let me know if Yahoo bounces it.

I got it Yahoo style!!!:tiphat:

Cbtech 04-10-2013 12:06 AM

Sasha i dont mind hosting...sent you PM with link if you want to use it.

Boosted Performance 04-10-2013 07:44 AM

Quote:

Originally Posted by Cbtech (Post 2259870)
Sasha i dont mind hosting...sent you PM with link if you want to use it.

Thank you very much for that. I will post the link in the original post when I get to my computer at work.

:tiphat:



Here it is: http://info.rubeng.net/BP/

Cbtech 04-10-2013 10:45 AM

:tup:

Dzel 04-10-2013 05:55 PM

When will you be ready for payment Sasha?

NitrousZ34 04-11-2013 03:50 AM

Quote:

Originally Posted by Cbtech (Post 2256599)
Sasha you had mentioned you will have 10 kits by the end of May. since im 12th how much further out from May should I expect? Just want to keep funding figures in mind. Thank you sir

If I can't fully pay for mine, or be in a position where I'm financially comfortable paying for mine then I'll switch you spots :tiphat:
I want this kit so bad but I'm getting hit so bad with bills :shakes head:
Plus my mom has been loaded with chemo therapy bills and is stressing over that so I want to make sure she is doing alright before I take care of myself.

I will have this kit sooner or later! Hopefully its soon :stirthepot:

Dzel 04-11-2013 05:26 AM

^ Gotta take care of your responsibilities first and foremost. I hope your mom does well we lost my father in law a couple of years back to cancer and at the same time we had a scare on my mother in law too but we caught hers in time. Anyway family first I always say and the rest will fall into place when ready.

Boosted Performance 04-11-2013 10:18 AM

I am going to be ordering materials for 15 kits. From experience, not everybody goes through with stuff like this. Things in life come up, and other priorities take precedence over a turbo kit. That is just how it is, and I understand that.

As for payment, I hope to start taking deposits mid May, but again, please remember that this is a lot of work, and it all has to be done right. If it takes longer, it is for the good of the customer, because I would not ship a turbo kit to a customer unless it is good enough (or better) to put on my own car.

Dzel 04-11-2013 01:40 PM

Quote:

Originally Posted by Boosted Performance (Post 2261774)
I am going to be ordering materials for 15 kits. From experience, not everybody goes through with stuff like this. Things in life come up, and other priorities take precedence over a turbo kit. That is just how it is, and I understand that.

As for payment, I hope to start taking deposits mid May, but again, please remember that this is a lot of work, and it all has to be done right. If it takes longer, it is for the good of the customer, because I would not ship a turbo kit to a customer unless it is good enough (or better) to put on my own car.

Spoken like a true perfectionist! Sasha I hate to beat a dead horse but in a baseball figure range how long after can we expect the total kit to have been shipped?

Dzel 04-11-2013 07:18 PM

I ask because I would like to make it to some car meets and HIN this summer.


All times are GMT -5. The time now is 08:32 AM.

Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Search Engine Optimization by vBSEO 3.6.0 PL2