![]() |
Originally Posted by Cell How do you put a product on layaway when it isn't even completed to be shipped out. You NEED to have a finished product to have
|
|
LinkBack | Thread Tools | Display Modes |
![]() |
#11 (permalink) |
Base Member
Join Date: May 2013
Location: Perth
Posts: 215
Drives: 2008 Skyline 370GT
Rep Power: 12 ![]() |
![]()
If you can show me the US Federal or Califorinia state law that states this, then I will happily agree with you. I am at a disadvantage not being an American but I see no reason why they would have to have the item physically on the shelf in order to arrange a layaway plan. If the seller cant deliver the product by the time that the last payment is made, then they are liable.
|
![]() |
Bookmarks |
|
|
![]() |
||||
Thread | Thread Starter | Forum | Replies | Last Post |
GTM Performance Engineering 370Z SUPERCHARGER KIT PRESS RELEASE | SAM@GTM | Forced Induction | 1161 | 02-16-2014 08:21 PM |
GTM Performance Engineering: Mild 7 A/T Twin Turbo Build | SAM@GTM | Forced Induction | 37 | 12-11-2013 12:23 PM |
GTM Performance Engineering: 370Z MHI Twin Turbo Pre-Release | SAM@GTM | Forced Induction | 120 | 09-06-2013 06:21 PM |
GTM Performance Engineering stage 2 600hp supercharger kits line-up press release | SAM@GTM | Forced Induction | 305 | 09-27-2012 03:23 PM |