![]() |
we can do a clean thorough install in about a week. custom dyno tune and all.
the key part of everything falling in line is having all the parts at the shop before dropping the car off for install. the way i do it at our shop is gathering all the parts for the job then call the customer to setup a date when we have a cart with all his parts ready to go. minimizes downtime A LOT. keeps the tech on his lift and focused all day. |
All times are GMT -5. The time now is 11:52 PM. |
Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Search Engine Optimization by vBSEO 3.6.0 PL2