Day 1
Got the calipers powdercoated, tires switched over and rear springs and sways installed.
Tomorrow: Clear bra, and the goal is to do the front half of the suspension, plus powdercoat the outsides of the ichiba spacers black (assuming they need it, I haven't opened that box yet). Since the rear took an hour and I've done several 350Z spring swaps in short order, it shouldn't take much more, but I do have 2 other sets of sport brakes to powdercoat and a Z06 set. I hate it when work gets in the way!
Teaser to see what it will look like!