Quote:
Originally Posted by John@Z1
(Not to thread jack)You are correct the instructions do leave a little out for install. Stillen calls for 13hrs labor but it will take most people 15-16hrs. And for those looking for dyno numbers. I recently tuned one to 444rwhp. If you would like more info please PM me.
|
Tq numbers?
__________________
GTM Supercharger/HKS Camp2/Berk cbe/Motordyne art pipes/Hotchkis sways/ Eibach Springs/ Black Volk TE37/Bridgestone S-04
Powered by
Last edited by tomnavone; 02-10-2011 at 11:26 PM.
|