View Single Post
Old 06-14-2010, 08:07 PM   #244 (permalink)
AgStacker
Base Member
 
AgStacker's Avatar
 
Join Date: May 2010
Location: SF bay area
Posts: 95
Drives: Car
Rep Power: 15
AgStacker is on a distinguished road
Default

I finished the program for the front emblem. It's 18 megabytes of windows notepad text and 3 hours of machining time per badge . I'm not sure if I took the right approach. I want to make the badge look as good as possible, but I also want to keep it from being outrageously expensive. The prototype badges will most likely be made with the program as is, but for production the cycle time must be cut dramatically. This doesn't necessarily mean they wont look as nice, I just need to make the program more efficient.
AgStacker is offline