View Single Post
Old 03-20-2010, 12:22 PM   #934 (permalink)
vipor
A True Z Fanatic
 
vipor's Avatar
 
Join Date: Aug 2009
Location: Euless, TX [ DFW ]
Age: 42
Posts: 13,531
Drives: Nismo 09-0183 QAB
Rep Power: 49
vipor has a reputation beyond reputevipor has a reputation beyond reputevipor has a reputation beyond reputevipor has a reputation beyond reputevipor has a reputation beyond reputevipor has a reputation beyond reputevipor has a reputation beyond reputevipor has a reputation beyond reputevipor has a reputation beyond reputevipor has a reputation beyond reputevipor has a reputation beyond repute
Default

Quote:
Originally Posted by dainedazz View Post
my man Tony-Tone you are THEEEEEE MAN. lol


How many sets will you be shipping out a week (just an estimate)?
Quote:
Originally Posted by F.I. Inc. View Post
UPDATE-
If that is the case, I should have the tooling within 2 weeks from today.

From there we need about 2-4 days to play with it and get all of the bends and rotations down. Once we have everything indexed, we will begin production.

The first set of fixtures/jigs will be completed by the end of today and I hope to have the second set of fixtures/jigs completed by the middle of next week. The reason we have decided to build 2 sets is to (Hopefully) speed production up! Obviously I have not built a production set yet. So, I can only try and calculate how long it will take to build each set. I am (hoping) that 2 people can produce 3-4 sets a day. We will not be working on them every single day due to the fact that we only have 4 people including (me) and we are almost two months behind just on cat back builds. I would like to have 5-8 sets mailed out every week if possible.
Here ya go
__________________

2009 NISMO # 0193 | QAB | Albums! | 05.04.10 (Dynojet) 291.94hp/248.28tq
Oil Cooler (DIY) | Custom Headlights | GTSPEC Braces | F.I. Long Tube Headers
vipor is offline   Reply With Quote