I haven't been able to spend much time in engineering for the past week or two. I have been buried in numerous other projects and haven't been able to break away to the dyno for awhile now.
Hopefully I can head back out and catch up with the guys next week. Nissan just asked us to build them a race car in less than 6 weeks so I've been trying to organize that build with all of the fabricator's, installer's, and painter's...yes...less than 6 weeks to build a competition ready race car!
|