Quote:
Originally Posted by Rusty
I put FI LTH's on my Z. The right side took me about 45 minutes do to. The left side took me about 5 hrs. There is more in the way. For me, the biggest headache was getting the exhaust manifold heat shield out. You wanting to pull the motor out will take a day. Then another day putting it back in. Then you have to worry about not breaking any sensors and reconnecting them too.
|
Well I got it done, now just to get it back in
was about 3 hours to get the motor pulled and gave me ALL the room to get the headers installed and worked out nicely to get the lightened flywheel/clutch and pressure plate and CSC elimination kit installed without actually dropping the trans