View Single Post
Old 04-02-2022, 12:54 PM   #1 (permalink)
ZoomZ
Track Member
 
ZoomZ's Avatar
 
Join Date: Jan 2017
Location: Vancouver, BC
Posts: 760
Drives: 17' 370Z Nismo
Rep Power: 40617
ZoomZ has a reputation beyond reputeZoomZ has a reputation beyond reputeZoomZ has a reputation beyond reputeZoomZ has a reputation beyond reputeZoomZ has a reputation beyond reputeZoomZ has a reputation beyond reputeZoomZ has a reputation beyond reputeZoomZ has a reputation beyond reputeZoomZ has a reputation beyond reputeZoomZ has a reputation beyond reputeZoomZ has a reputation beyond repute
Default Front (engine) tower bar

Looking at FSM call for 38 ft.lbs on all nuts and bolts.

But I'm confused by following highlighted statement:

INSTALLALLATION (this is how it's spelled in FSM )
Note the following, and install in the reverse order of removal.

*Perform final tightening of bolts and nuts at the vehicle installation position, under condition with all tires above level ground.

Is it wheels on ground with weight on? or in the air?

Last edited by ZoomZ; 04-02-2022 at 12:57 PM.
ZoomZ is offline   Reply With Quote