Confirmed the intakes are at the right height after lowering the car back down on the motor. I also finished mocking up the cold side piping, all that's left is to mount the BOV and MAF flanges.
Plan is to have all the welding done tonight after work and bead roll everything. Then it's bolting on the flywheel/clutch and transmission