Quote:
Originally Posted by Rusty
Started building the deck for the pool. Using a post hole to dig the holes. Getting a good shoulder work-out. The first went with no problem. Dug 30" down. The 2nd hole. Hit a huge rock at 24" that I had to use a spud bar on to break it up. The 3rd hole, I hit water at about 20". The 4th hole. About 6" down. I hit a tree stump. After that. I called it a day. Tomorrow, I'll get the chain saw out and cut the stump.
I'm going to feel this in the morning.
|
I'm already sore after just reading what you did today. I need to go lay down.