Quote:
Originally Posted by Rusty
So far today. Ghost's oil cooler is finished along with his TrackSpec hood vents. JL is getting his installed. Bravo Delta is installing a CoolWorkX shifter. He already did change his brake pads.
|
And hates the pads :lmao:
Sent from my SM-G965U using Tapatalk