View Single Post
Old 04-22-2021, 09:36 AM   #739 (permalink)
gbrettin
A True Z Fanatic
 
gbrettin's Avatar
 
Join Date: Oct 2010
Location: Portage, MI
Posts: 2,285
Drives: Tricycle
Rep Power: 589151
gbrettin has a reputation beyond reputegbrettin has a reputation beyond reputegbrettin has a reputation beyond reputegbrettin has a reputation beyond reputegbrettin has a reputation beyond reputegbrettin has a reputation beyond reputegbrettin has a reputation beyond reputegbrettin has a reputation beyond reputegbrettin has a reputation beyond reputegbrettin has a reputation beyond reputegbrettin has a reputation beyond repute
Default

Marked and drilled the holes last night. Looks like I'm committed now! It will get welded Saturday.

Next up. Fuel lines...

Not even sure what to think about this part. The tank needs to be drained. I have new lines and SOME fittings. I need to buy more, but wont until I see the whole run. I'll start thinking about A2W lines and transmission cooler mounting at the same time.

-Edit

There was a lot of anxiety cutting the holes. A whole lot of time gone into it. THAT is why this part of the process has been spaced out. It's easier to think about it for a while and circle back. No need to rush to punch a hole.











Last edited by gbrettin; 04-22-2021 at 11:43 AM.
gbrettin is offline   Reply With Quote