Thread
:
Mr. G. Brettin's Slow Motion Leg Hump
View Single Post
04-21-2021, 11:16 AM
#
738
(
permalink
)
gbrettin
A True Z Fanatic
Join Date: Oct 2010
Location: Portage, MI
Posts: 2,284
Drives: Tricycle
Rep Power:
589151
Looks like I have 1/32 in-between the edge of the vband and the alt. Ill need to grind the back corner a bit and then put in a metal heat shield. I'm not going to be down replacing a 400 alternator every year.
All the bolts are in on the transmission now. I just need to find bolts for the flexplate... or get new ones... Anyway...
The BOV placement is going to be on the inside. There's not a lot of options really. They are going to be either slightly pulled back hidden or our where you can see them.
Good news with the Lokar oil dipstick. I can adjust the cable on it. 100% useable.
So yeah, not much in the way of movement. Next steps are pulling electrical and fuel. I didn't feel like doing either of those things last night.
gbrettin
View Public Profile
Send a private message to gbrettin
Find More Posts by gbrettin