Got about 95% of the trim done in the dungeon bathroom. Still have to figure out what I what to do with the window. Have an idea on that. Have to tile around the shower basin and install the shower doors. Hopefully to be finished by next weekend.
Wifey now wants to paint the floor. After I installed the baseboard trim.