Quote:
Originally Posted by -ZS-Carpenter
What a day. After the great start I found the detail with the note that said the sketch artist left a whole bunch of rebar off the rebar schedule so there is not enough to build the fvcking thing
So 3 hour with 3 guys at the bender trying to fab #8 bar with the small bit of extra I had sent out for the footing pour. It's as close as it can be bent in the field. My bender can do a 10° bend. I needed a 7°. That's what they get if they don't take the time to figure chit right.
Also had to have a truck sent out asap to bring a bunch of #5. So I got to ruin another guys holiday weekend.
I wish it was a weekday and this see you next Tuesday was in the office. He'd hear about where I'm going to stuff his print
Sent from my SM-G965U using Tapatalk
|
That whole job is a clusterfvck of a chitshow.