View Single Post
Old 04-22-2020, 10:36 PM   #3007 (permalink)
-ZS-Carpenter
A True Z Fanatic
 
Join Date: Sep 2016
Location: Illinois
Posts: 2,410
Drives: 13 370z 6MT
Rep Power: 2684367
-ZS-Carpenter has a reputation beyond repute-ZS-Carpenter has a reputation beyond repute-ZS-Carpenter has a reputation beyond repute-ZS-Carpenter has a reputation beyond repute-ZS-Carpenter has a reputation beyond repute-ZS-Carpenter has a reputation beyond repute-ZS-Carpenter has a reputation beyond repute-ZS-Carpenter has a reputation beyond repute-ZS-Carpenter has a reputation beyond repute-ZS-Carpenter has a reputation beyond repute-ZS-Carpenter has a reputation beyond repute
Default

Quote:
Originally Posted by Rusty View Post
I should make it a little clearer. I like soldiering water lines together. I learned to soldier when I worked for Fruehauf way back in the day. One project I did, had over 3,000 soldier joints. I only had a handful that I had to redo.



Chit piping, if new doesn't bother me. Redoing old lines does.



At Elliott. I did pipe fitting there. I did some pipe fitting at the power plant too.
I don't mind sweating copper lines and pex is supply lines for dummies. But count me out on the poo pipes

Sent from my SM-G965U using Tapatalk
-ZS-Carpenter is offline