View Single Post
Old 02-09-2020, 10:51 AM   #2049 (permalink)
jwick
A True Z Fanatic
 
jwick's Avatar
 
Join Date: Dec 2010
Location: Houston
Posts: 14,532
Drives: '10 G37 6MT
Rep Power: 2465056
jwick has a reputation beyond reputejwick has a reputation beyond reputejwick has a reputation beyond reputejwick has a reputation beyond reputejwick has a reputation beyond reputejwick has a reputation beyond reputejwick has a reputation beyond reputejwick has a reputation beyond reputejwick has a reputation beyond reputejwick has a reputation beyond reputejwick has a reputation beyond repute
Default The New “What did you do with your Z today” (with off topic replies) XXXV

Quote:
Originally Posted by jchammond View Post
1.5” overhang, for box to set back down on top

Seeing how I’m still 20” above concrete; thinking about building up 12-18” so I’ll have minimum 12’ ceiling height

Got 4-more weeks of waiting,,,so I’ll look over my blueprints

On a more serious note, so you are going to unbolt and lower the whole structure down to the slab?
__________________
'10 G37T 6MT Graphite/Graphite - BP - G37T Build

jwick is offline