Quote:
Originally Posted by jchammond
8.5” of wood will sit around the 6” minimum thickness concrete; but the building will be bolted to the 20-6x6 posts that are cemented 42-48” in the ground before any more wood is fastened to it.
The 5/8” bolts are currently holding the structure suspended until the concrete is finished & drys 5-6 weeks.
|
__________________
“Happiness is having a large, loving, caring, close-knit family in another city.”-George Burns
|