Quote:
Originally Posted by -ZS-Carpenter
You should. The approach really needs to be a separate pour with expansion and rebar pegs. This lets the approach hinge with the floor without damaging anything.
I'd also pour the approach about 1/2" below the top of the floor. Helps keep wind driven rain from blowing under the door.
|
Thanks for that reply

as you post up some tools I’ve never even heard of