View Single Post
Old 01-20-2020, 08:03 AM   #9516 (permalink)
jchammond
A True Z Fanatic
 
jchammond's Avatar
 
Join Date: Nov 2014
Location: South Carolina
Age: 58
Posts: 15,204
Drives: 13’ 370Z TS 7A/T
Rep Power: 2684395
jchammond has a reputation beyond reputejchammond has a reputation beyond reputejchammond has a reputation beyond reputejchammond has a reputation beyond reputejchammond has a reputation beyond reputejchammond has a reputation beyond reputejchammond has a reputation beyond reputejchammond has a reputation beyond reputejchammond has a reputation beyond reputejchammond has a reputation beyond reputejchammond has a reputation beyond repute
Default

Quote:
Originally Posted by -ZS-Carpenter View Post
You should. The approach really needs to be a separate pour with expansion and rebar pegs. This lets the approach hinge with the floor without damaging anything.

I'd also pour the approach about 1/2" below the top of the floor. Helps keep wind driven rain from blowing under the door.
Thanks for that reply as you post up some tools I’ve never even heard of
__________________
MazWorx built long block | FI-TT-100 Stage 2.75 | IPT built 7A/T

http://www.the370z.com/members-370z-...s-musings.html
jchammond is offline