Quote:
Originally Posted by jchammond
After watching some of these videos & knowing how long it’s gonna be before lowering my box down, contemplating just focusing on the pad for garage & the doing the ramp afterwards
|
You should. The approach really needs to be a separate pour with expansion and rebar pegs. This lets the approach hinge with the floor without damaging anything.
I'd also pour the approach about 1/2" below the top of the floor. Helps keep wind driven rain from blowing under the door.