View Single Post
Old 01-03-2020, 09:24 PM   #8189 (permalink)
jchammond
A True Z Fanatic
 
jchammond's Avatar
 
Join Date: Nov 2014
Location: South Carolina
Age: 58
Posts: 15,204
Drives: 13’ 370Z TS 7A/T
Rep Power: 2684395
jchammond has a reputation beyond reputejchammond has a reputation beyond reputejchammond has a reputation beyond reputejchammond has a reputation beyond reputejchammond has a reputation beyond reputejchammond has a reputation beyond reputejchammond has a reputation beyond reputejchammond has a reputation beyond reputejchammond has a reputation beyond reputejchammond has a reputation beyond reputejchammond has a reputation beyond repute
Default

Quote:
Originally Posted by -ZS-Carpenter View Post
35 days is a cover thy *** number. You need 27 days to get a "full cure" break. That is the point the mix hits what should be it's min compression. You can install your lift at 7 days with the temps you'll have. You still need to wait 3ish weeks before putting a car on the slab and I'd go a full month before putting the car on the lift but you can have a lot of things ready to go long before you can use the lift.
I know the 2-poster weighs 2500#
Salesman emphasized about concrete & i don’t mind the wait...got other things to be doing
__________________
MazWorx built long block | FI-TT-100 Stage 2.75 | IPT built 7A/T

http://www.the370z.com/members-370z-...s-musings.html
jchammond is offline