View Single Post
Old 01-03-2020, 04:42 AM   #8097 (permalink)
jchammond
A True Z Fanatic
 
jchammond's Avatar
 
Join Date: Nov 2014
Location: South Carolina
Age: 58
Posts: 15,204
Drives: 13’ 370Z TS 7A/T
Rep Power: 2684395
jchammond has a reputation beyond reputejchammond has a reputation beyond reputejchammond has a reputation beyond reputejchammond has a reputation beyond reputejchammond has a reputation beyond reputejchammond has a reputation beyond reputejchammond has a reputation beyond reputejchammond has a reputation beyond reputejchammond has a reputation beyond reputejchammond has a reputation beyond reputejchammond has a reputation beyond repute
Default

Not really wanting to add more weight, until after I raise box & prep underneath,make concrete form,pour,dry & then lower box onto the pad....then anchor it to the cemented 6x’s that are sandwiched every 4’ between the 2x12’s...a couple pics that show them in between cemented posts that will ultimately hold box in place...while resting on the concrete
I’ll have to wait 5-weeks after concrete is poured, before boring holes for my “Mohawk” 2-poster
Attached Images
File Type: jpg 4E895734-953C-4ED7-AE8D-3BAC4E254B0F.jpg (176.3 KB, 11 views)
File Type: jpg 95A46CE8-ABDC-43B9-8E4F-8A2100C783F7.jpg (273.6 KB, 9 views)
__________________
MazWorx built long block | FI-TT-100 Stage 2.75 | IPT built 7A/T

http://www.the370z.com/members-370z-...s-musings.html
jchammond is offline