Quote:
Originally Posted by jchammond
On a more realistic note...At the rate my garage is going-I plan to have concrete poured before end of year (weather permitting)
Then the lift mfg. said minimum 35dayz before I can install lift on concrete
That’s time to hang the door & put all the exterior OSB & roof on
My “Big-Box” will be temporarily anchored to the 6x6 posting that I’m implanting between 2x12’s (a bit higher than pad will be) then lowered down onto concrete
Still gonna anchor it back to post & will be anchored to concrete as well
This way I can have a record of the feeter around the perimeter & the depth of post as well
But could be March 1———April 1 before completion
So my ZdayZ debut is most likely gonna be 2021’ ... cause you know I don’t get in a rush doing things
|
How thick of concrete do you plan on... and I noticed the ramp entrance is going be something to look at also...
I was hoping for a quicker completion date, as I am so ready for the wine and cheese party that you told me you’d be having... Do you think you could make some of them little finger sammichs ?