On a more realistic note...At the rate my garage is going-I plan to have concrete poured before end of year (weather permitting)

Then the lift mfg. said minimum 35dayz before I can install lift on concrete

That’s time to hang the door & put all the exterior OSB & roof on

My “Big-Box” will be temporarily anchored to the 6x6 posting that I’m implanting between 2x12’s (a bit higher than pad will be) then lowered down onto concrete

Still gonna anchor it back to post & will be anchored to concrete as well

This way I can have a record of the feeter around the perimeter & the depth of post as well

But could be March 1———April 1 before completion



So my ZdayZ debut is most likely gonna be 2021’ ... cause you know I don’t get in a rush doing things