The downpipe is finally in and all the new O2 sensors. I ended up putting the Innovate wide band sensor in the drivers side down pipe. Last thing I need to crawl under there for is to reconnect the steering shaft and put on the subframe plates.
Plumbed up the power steering cooler, which I had to move over an inch or so to clear the radiator support upright I forgot about. The hoses were P clamped to the frame rail after I took this pic to keep them out of the way. The wiring will get cleaned up tonight with some zip ties.
All the hoses and upper intercooler pipes secured and clamped
Day time pic is so much better
I think the couplers aren't going to make it this week due to the hurricane.