Taking about 2 hours a night after work is working out pretty well as far as progress goes.
The drivers side downpipe would have been completed if I remembered to weld on the rear O2 bung.
A messy shot of where the 2-1 merge exits.
I have a length of 4" tacked to the V band at the right angle to clear the sway bar, cutting it to length today and a bunch of 15* pizza slices to get it angled up and over to the muffler.