Tomorrow will be a sht show. I need a 55 meter pump for a 480~ pour at 7:30. Got the call at 5 tonight that the 55 is broke, they think the motor is blown. Only pump available is a 39m. I have to move a small mountain of recycled concrete out of the way to get the 39 set up in probably 3 maybe 4 spots to reach everything plus get the trucks backed up to it.
What should have been a lazy 6 hour pour is now a cluster
I'm taking the weekend off after this they can kiss my