1st pic. Smear anti-seize inside the bore. Next, install the bushing from the bottom. Here, I use my trusty ball joint press. When tightening down. Take a big hammer and tap on the sides of the sub-frame. The vibrations help the bushing to slide in. All the SPL bushings are installed from the bottom.
2nd pic. Installed.
3rd pic. All 4 installed.
Last edited by Rusty; 02-16-2019 at 01:00 AM.
|