Nice to have found some time to work on the Z lol
Z1 2-piece rotors installed
Bailed on the brake ducts and SPL FUCAs. Likely will bail on the oil cooler, too. Various odds and ends still need to be buttoned up before she's roadworthy. It's been so long, I need to make sure she still runs