Z1 25-Row Oil Cooler is now installed. Getting her ready for the Touge Fest track event in November. Also have SS brake lines, and EBC rotors and pads that will be going on in a week or two.
Also getting the car ready for forced induction next year. Looking to do a diff swap, tire and wheel upgrade, and swap the clutch and flywheel then she will be ready.
You can follow my build on my YT channel as well:
https://www.youtube.com/channel/UCy8...O0uOa29rjLuaw/