View Single Post
Old 06-30-2018, 04:27 PM   #4863 (permalink)
madwi
A True Z Fanatic
 
madwi's Avatar
 
Join Date: Sep 2012
Location: West Michigan
Posts: 31,410
Drives: Granma red Z
Rep Power: 2684429
madwi has a reputation beyond reputemadwi has a reputation beyond reputemadwi has a reputation beyond reputemadwi has a reputation beyond reputemadwi has a reputation beyond reputemadwi has a reputation beyond reputemadwi has a reputation beyond reputemadwi has a reputation beyond reputemadwi has a reputation beyond reputemadwi has a reputation beyond reputemadwi has a reputation beyond repute
Default

Quote:
Originally Posted by Rusty View Post
The way I would do it. 13ft ceiling. 6", 5000 psi, fiber reinforced, rebarred concrete floor. For where the posts would sit. That area would be a 2ft square, 2ft deep, with 2 layers of rebar. The posts would be anchored with L bolts in the concrete. The L bolts would be 20" long. Having 2" sticking out to mount the posts to. The 2ft squares would be poured first. Let them set-up. Then pour the rest of the floor. The 2ft squares and floor would be the same level.
Going to be lifting garbage trucks or the motorhome?
madwi is offline