Quote:
Originally Posted by Spooler
Machine Shop Estimate is 3-4 more weeks. It is what it is. I want their work to be perfect so I will never rush a machine shop. I am good with it. Thank goodness for buying a used long block to build off of or this would have sucked. I have DSS Pro axles to install and a MA Diff cooler to install. Plenty to keep me busy.
|
Those are some pretty Beefy looking axles,,,if they came from same place Madwi got his 2# boost gauge from!