Quote:
Originally Posted by Leingod
Ok. Thinking about the plan of attack for everything.
I arrive Friday morning. Rest for a few hours. We get cranking on stuff whenever everyone is available Friday evening.
Friday:
Remove bumper, mess around will cooler and intake.
PB blast the hell out of bolts and remove as much exhaust as possible
Madwi/Susan can work on diffuser, side blades, fairlady badge, and bt-r button
Saturday: We exorcise the demon bolts. Put HFC's and Exhaust on. Finish intake and oil cooler. While we do under car stuff, Susan can contort herself with Madwi supervising the RJM clutch assembly.
Sunday: Any final touch ups like loading a quick tune, vinyl wrap pillars, etc. Can go for a cruise and get some photos around the lake.
Monday: I sleep like the dead
|
Is your Z automatic or manual? and do you have the oem shift knob on it? (if its manual)