House projects coming along! Removed carpets and laminate, removed trim, installed hardwood floors over concrete (used a vapor barrier and 3/4 plywood as a base, blue screwed into the floor), painted walls, reinstalled trim, stripped stairs, re-stained stairs, installed canned lights in the ceiling, repainted ceiling. Next up is the renters kitchen floor.
__________________
2014 370z Touring Sport Magma Red MT // BP Single Turbo 6467 // 63mm TB's // Z1 Ported Upper Mani // RJM Pedal // Zspeed Stage 3 Clutch // 526 WHP, 451 WTQ
2006 350z (Sold) // 1990 300zx (Sold) // 1985 300zx 2+2 (Sold)
|