Quote:
Originally Posted by Rusty
Weld threaded pipe fitting to a vert steel beam in the shop. Screw a ball valve into the end of welded fitting. Screw pipe nipple and 90deg elbow into ball valve. Turn the elbow so that it's pointing up. Open ball valve and fill with water. Turn the elbow down. Do this to a couple of beams. Go tell the new guy that he has to go around a check the beams for moisture content. And he has to measure how much is in each beam. Then give the report to the general foreman, who is on the joke.
|
Some days I sure miss working in the shop
jokes for days.
Newbie, go to the basement and get some more carbide inserts from storage. Stairs is in the president's office, in his closet is a trap door to the basement. He likes to control the inventory but dont worry anyone can just go in there.