Quote:
Originally Posted by Chuck33079
If we miss out on the first run, how long before these are regularly stocked?
|
They likely won't be in regular stock for quite a while as I can only run them in small batches of 10 units or so. Each unit requires 6-7 hrs of fabrication and processing so 10 units is a solid 60-70hrs of work for each small batch in addition to keeping up fabrication of my clutch pedal assemblies. That is why we're looking at ~3 weeks out for first batch to be ready while dedicating 20+ hrs a week to these + building pedal assemblies. Figure about June 20th for getting in on the next batch of 10 MC's.