View Single Post
Old 06-04-2015, 07:27 AM   #2665 (permalink)
Leingod
A True Z Fanatic
 
Leingod's Avatar
 
Join Date: Mar 2015
Location: Some Place Cold
Posts: 16,060
Drives: In Circles
Rep Power: 2684396
Leingod has a reputation beyond reputeLeingod has a reputation beyond reputeLeingod has a reputation beyond reputeLeingod has a reputation beyond reputeLeingod has a reputation beyond reputeLeingod has a reputation beyond reputeLeingod has a reputation beyond reputeLeingod has a reputation beyond reputeLeingod has a reputation beyond reputeLeingod has a reputation beyond reputeLeingod has a reputation beyond repute
Default

Quote:
Originally Posted by GaleForce View Post
What if I told you every single one of our control panels and communication panels look like that. Not to mention the schematics, most were last updated 1983... that is if the panel actually has schematics.

Good times.
I would literally cry. I can't stand sloppy work for cables. I need to be able to pull a patch from a patch panel without having to dig through 4 other wires to see the correct number.

Quote:
Originally Posted by onzedge View Post
You at least look happy.
I started to frown after about 3 hrs of work since the idiot never ran a cross over cable from a managed switch to an unmanaged.

Quote:
Originally Posted by madwi View Post
Oh man, our network team would KILL that person. If the cover on the rack is left off by mistake, heads are rolling!
Like I said.... let me just come work for you
__________________
I AM FLOOF! SOMEBODY FLOOF MY HORN!! ALL HAIL THE FLOOF!!I JUST FLOOFED ON THE FLOOR
Leingod is offline