Exa pumps going out today
UpRev cables going out early next week
...........so look for the delivery man
90 % of the IC pipes are going out to the powder coater today. Don't have BOV flanges for the first pipe that goes in to the FMIC, so once those flanges arrive (next week) I will weld them on real quick, and take those to the powder coater as well.
Now, I will focus on finishing up the down pipes (welding V-band flanges on), Manifolds (welding flanges on them), Y-pipes (welding flanges), and recirc tubes.
The shop will shortly turn in to a giant shipping warehouse