Spent a couple of days working on the IC pipes. Today I finished welding 16 sets of 3" charge pipes (showing only driver side here):
These are going to be dropped off at the machine shop for MAF sensor slots to be milled in. Once that is done, MAF sensor housings will be welded. Hopefully the machine shop can get them done by Thursday nigh...so I can take all the IC pipes to the powder coater on Friday.
I am now waiting for some flanges (3-bolt) for the manifolds, 20 wastegates and a bunch of BOV's. Once those come in, the respected flanges will be welded as well. Hope to see those at the end of this week.
Other than that things are moving along nicely.
There is two V 2.0 kits, and 4 V 1.5 still left/available.