Most of the tear down is completed, so far fairly simple. Need to remove the existing oil cooler then I'm close to the SC installation.
I'll complete the fuel injector install today then start running the cooler lines.
After that the SC .
Last edited by kentmo280z; 12-23-2014 at 01:43 PM.
|