Got my flywheel and clutch on finally since I had to order another clutch alignment tool so now the only thing left to go on before dropping the built motor is the CJM S1 RFS system I just purchased. Charles told me with the motor out it would be a lot easier to do the install. Turbo's and 3" gtm down pipes are wrapped up for heat and my new csf radiator should help with heat. This week I will tackle the rear diff bushings.
|