Quote:
Originally Posted by Liquid_G
Ron so that first pic, I'm assuming your box is separate piece from the floor itself right?
|
Correct. I installed the box and its top plate first, then cut my finished floor piece, which is split down the center... Layed it into place, and drilled through in a few spots for locating dowels, removed both sides of the finish panel, and applied laminate.
The entire assembly can be removed in about 15 minutes with a Phillips screwdriver and a 10mm wrench.