Quote:
Originally Posted by synolimit
|
PPG do gearboxes ..... In terms of gearboxes ... I already have a Holinger HS6 in stock ... just waiting for all the other stuff to arrive (budget-bound at present, so it is a case of making purchases each month - donor VQ35HR engine assembly on the floor, steel-crank ordered, rods/pistons next then cams/valves/springs/retainer package and so it goes on - will take around 12 months to assemble all the bits).
In terms of dry-sump, there are 2 options ....
Dailey engineering,
Dry Sump Oil Pumps
or
ARE,
Armstrong Race Engine Systems - Cast Aluminum And Magnesium Components For Professional Racing
Apologies to the OP for going off-thread